PAU WRAP
Live / Registered — Registered (as of 21 Jul 2026)
What this means for you
Registered since 21 Jul 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 21 Jul 2032: the §71 affidavit of use).
Record
- Serial number
- 79433007
- Registration number
- 8350182
- Mark type
- Word mark
- Filed
- 07 Jul 2025
- Published for opposition
- 02 Jun 2026
- Registered
- 21 Jul 2026
- Next maintenance filing
- §71 affidavit of use, due by 21 Jul 2032 (grace period to 21 Jan 2033)
- Attorney of record
- Jason L DeFrancesco
Goods and services
- Class 006 — Metal goods: pipes made out of metal and coated in plastic
- Class 017 — Rubber goods: Sealing members, namely, sealing materials in the nature of plastic sleeves for tubes
- Class 019 — Non-metallic building materials: Rigid non-metal pipes with cover panels and rigid non-metal pipes with coatings made out of plastic; plastic coated rigid pipes not made out of metal
- Class 037 — Building construction and repair services: Building construction; repair services, in particular repair services for pipes, pipelines, welding lines and coatings; installation services, namely, installation of pipelines and pipeline coating systems; construction of pipelines; carrying out of horizontal drillings, namely, horizontal directional drilling for installing underground pipelines; pipe laying services by means of impact moling
Owner
Prosecution history
- 21 Jul 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 21 Jul 2026 — REGISTERED-PRINCIPAL REGISTER
- 02 Jun 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 02 Jun 2026 — PUBLISHED FOR OPPOSITION
- 28 May 2026 — NOTIFICATION PROCESSED BY IB
- 27 May 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 13 May 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 13 May 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 01 May 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 23 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 23 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 23 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 22 Jan 2026 — REFUSAL PROCESSED BY IB
- 06 Jan 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 06 Jan 2026 — REFUSAL PROCESSED BY MPU