TOCOS
Live / Registered — Registered (as of 04 Aug 2026)
What this means for you
Registered since 04 Aug 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 04 Aug 2032: the §71 affidavit of use).
Record
- Serial number
- 79429154
- Registration number
- 8374634
- Mark type
- Design + words
- Filed
- 09 Apr 2025
- Published for opposition
- 16 Jun 2026
- Registered
- 04 Aug 2026
- Next maintenance filing
- §71 affidavit of use, due by 04 Aug 2032 (grace period to 04 Feb 2033)
- Attorney of record
- Theodore Shih
Goods and services
- Class 009 — Scientific and electric apparatus: Variable electric resistors; electrical switches; potentiometers in the nature of a three-terminal electric resistor; rotary encoders; electrical cord switches, namely, coded switches, rotary coded switches and electrical rotary coded switches; magnetic sensors being Hall integrated circuits; measuring and testing machines and instruments, namely, electronic angle sensors and electronic sensors for measuring angles
- Class 011 — Environmental control apparatus: Electric space heaters; electric heaters for vehicles; electric heaters, namely, electric heaters for commercial, industrial and residential uses; electric heaters for heating a connected surface, namely, electric heaters for outdoor-exposed glass, millimeter-wave radar, lidar apparatus, camera lenses, molded products, batteries, seats and engines
Owner
Prosecution history
- 04 Aug 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 04 Aug 2026 — REGISTERED-PRINCIPAL REGISTER
- 16 Jun 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Jun 2026 — PUBLISHED FOR OPPOSITION
- 10 Jun 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 18 May 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 29 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 29 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 29 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 15 Nov 2025 — REFUSAL PROCESSED BY IB
- 29 Oct 2025 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 29 Oct 2025 — REFUSAL PROCESSED BY MPU
- 12 Sept 2025 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 11 Sept 2025 — NON-FINAL ACTION WRITTEN
- 04 Sept 2025 — ASSIGNED TO EXAMINER