MOISTURE MATE
Live / Registered — Registered (as of 23 Jun 2026)
What this means for you
Registered since 23 Jun 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 23 Jun 2032: the §71 affidavit of use).
Record
- Serial number
- 79428505
- Registration number
- 8309412
- Mark type
- Word mark
- Filed
- 19 Feb 2025
- Published for opposition
- 05 May 2026
- Registered
- 23 Jun 2026
- Next maintenance filing
- §71 affidavit of use, due by 23 Jun 2032 (grace period to 23 Dec 2032)
- Attorney of record
- Rebecca S. Lessard
Goods and services
- Class 019 — Non-metallic building materials: Materials, not of metal, for building and construction, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; mouldings, not of metal, for building, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels; plastic mouldings for building construction, namely, wall forms and panels; plastic articles for use in building, namely, wall forms, panels, and floor boards; plastic panels for use in building; preformed building panels made of concrete and plastic; non-metallic structural building elements, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; prefabricated non-metallic building constructions, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; prefabricated non-metallic building components, namely, concrete wall forms, concrete panels, plastic wall forms, plastic panels, floor boards, fascia, roof trusses; building panels, not of metal, namely, concrete and plastic building panels; non-metallic cladding for buildings, namely, concrete and plastic cladding panels; building elements of concrete, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; articles of concrete for construction purposes, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; architectural concrete products for building purposes, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete products for use in building, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete; concrete prefabrications, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; concrete panels; concrete building panels; concrete cladding panels; preformed building panels made of concrete; preformed building panels made principally of concrete; preformed concrete building elements, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; precast concrete building elements, namely, concrete wall forms, concrete panels, composite blocks, concrete slabs, concrete boards, and concrete beams; non-metal nail plates being component parts of non-metal roof trusses; non-metallic roof trusses; non-metallic building materials for roofs, namely, roof trusses; rigid structure joint connectors, not of metal, for building and construction purposes
Owner
Prosecution history
- 23 Sept 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 20 Aug 2026 — NEW REPRESENTATIVE AT IB RECEIVED
- 23 Jun 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 23 Jun 2026 — REGISTERED-PRINCIPAL REGISTER
- 05 May 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 05 May 2026 — PUBLISHED FOR OPPOSITION
- 30 Apr 2026 — NOTIFICATION PROCESSED BY IB
- 29 Apr 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 16 Apr 2026 — REFUSAL PROCESSED BY IB
- 15 Apr 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
- 15 Apr 2026 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
- 03 Apr 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 02 Apr 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 02 Apr 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 02 Apr 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED