SALOLEA
Live / Allowed — Approved for publication (as of 01 Oct 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 10 Jun 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79428397
- Mark type
- Stylized text
- Filed
- 10 Jun 2025
- Attorney of record
- Victoria Walker
Goods and services
- Class 006 — Metal goods: Props of metal, namely, metal stanchions; drain pipes of metal; doors of metal; ironmongery, namely, metal brackets for general use; fittings of metal for furniture; hardware of metal, small, namely, metal pulleys; locks of metal, other than electric; safes, metal and non-metal; strap-hinges of metal; identity plates of common metal
- Class 009 — Scientific and electric apparatus: Encoded key cards; face recognition equipment, namely, biometric identification apparatus; intercommunication apparatus, namely, door phones; electronic key fobs being remote control apparatus; electric door bells; locks, electric; theft prevention installations, electric, namely, electric locks; biometric fingerprint authentication door lock; batteries, electric; electrified fences
- Class 019 — Non-metallic building materials: Wooden floor boards; rock crystal; concrete building elements being concrete panels; floor tiles, not of metal; refractory construction materials, not of metal; doors, not of metal; plastic-steel doors and windows; advertisement columns, not of metal; building glass; coatings being building materials, namely, bituminous roof coatings
- Class 020 — Furniture: Cabinet; shelving units being furniture shelves; furniture; towel stands; clothes hangers; bathroom vanities being furniture; decorative mirror; doors for furniture; padlocks, other than electronic, not of metal; door handles, not of metal.
Owner
Prosecution history
- 01 Oct 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 21 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 21 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 19 Mar 2026 — REFUSAL PROCESSED BY IB
- 28 Feb 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 28 Feb 2026 — REFUSAL PROCESSED BY MPU
- 31 Jan 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 30 Jan 2026 — NON-FINAL ACTION WRITTEN
- 29 Jan 2026 — ASSIGNED TO EXAMINER
- 28 Jan 2026 — APPLICATION FILING RECEIPT MAILED
- 28 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 24 Jul 2025 — SN ASSIGNED FOR SECT 66A APPL FROM IB