QUETTA
Live / Allowed — Published for opposition (as of 13 Oct 2026)
What this means for you
Approved and waiting on proof of use. It will register unless the applicant drops it, and its 08 Apr 2025 filing date already counts against anyone who files later.
Record
- Serial number
- 79427402
- Mark type
- Design + words
- Filed
- 08 Apr 2025
- Published for opposition
- 13 Oct 2026
- Attorney of record
- Todd A. Sullivan
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable software for monitoring and management of data center infrastructure, including energy consumption, network performance, service level agreement (SLA) compliance, and physical and digital access control and hardware in the nature of servers, network switches, routers, direct liquid cooling (DLC) equipment, and data center racks in connection with a data center; downloadable electronic publications in the nature of technical manuals, guides, and reports in the field of data center infrastructure, cooling technology, and sustainability; downloadable interactive electronic publications in the nature of interactive technical guides and three-dimensional digital twin visualizations in the field of data center infrastructure and design
- Class 042 — Scientific and technological services: Engineering and computer consultancy services; design and development of data processing systems; programming of electronic computer data processing software; computer programming services for data processing; technical advice relating to data processing; rental of computers for data processing; technical verification of electronic data processing systems; computer programming for data processing and communication systems; services for the design of electronic data processing software; software engineering services for data processing programs; research in the field of data processing technology; design and development of systems for the input, output, processing, display and storage of data; computer project management in the field of electronic data processing (EDP); rental of computer software for monitoring and management of data center energy consumption, network performance, and physical and digital security access, data processing equipment and computer peripheral equipment; rental services relating to data processing equipment and computers; preparation in the nature of design, customization, and configuration of data processing programs; research in the field of data processing; updating of software for data processing; programming of data processing programs; installation of data center monitoring and management software; repair of computer software; rental of software for monitoring and management of data center energy consumption, network performance, and physical and digital security access; computer software consultancy; maintenance of computer software; creation of software, namely, computer software development; design of computer hardware; development of computer hardware; technical consultancy relating to computer hardware use; design of computer hardware; design and development of computer hardware; development of computer hardware equipment; design and development of hardware architecture; troubleshooting of issues off hardware and software for computers; technical consultancy relating computer hardware use; technical advice with respect to computer hardware and software; information services on hardware and software design and development; technical project studies in the field of hardware and software for computers, namely, feasibility studies, capacity planning, and infrastructure design for data center facilities; advisory and information services relating to the design and development of computer hardware; advice and consultancy in relation to computer hardware and software design and development
Owner
Prosecution history
- 13 Oct 2026 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 13 Oct 2026 — PUBLISHED FOR OPPOSITION
- 07 Oct 2026 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 Sept 2026 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 24 Aug 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Aug 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Aug 2026 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 26 Mar 2026 — REFUSAL PROCESSED BY IB
- 12 Mar 2026 — NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
- 12 Mar 2026 — REFUSAL PROCESSED BY MPU
- 10 Feb 2026 — NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
- 09 Feb 2026 — NON-FINAL ACTION WRITTEN
- 31 Jan 2026 — ASSIGNED TO EXAMINER
- 30 Jan 2026 — APPLICATION FILING RECEIPT MAILED
- 30 Jan 2026 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED