PRESTIGE UNICAST

Live / Registered — Registered (as of 12 May 2026)

What this means for you

Registered since 12 May 2026. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 12 May 2032: the §71 affidavit of use).

Record

Serial number
79415301
Registration number
8248468
Mark type
Design + words
Filed
18 Oct 2024
Published for opposition
09 Dec 2025
Registered
12 May 2026
Next maintenance filing
§71 affidavit of use, due by 12 May 2032 (grace period to 12 Nov 2032)
Attorney of record
Moji Onabanjo

Goods and services

  • Class 019 — Non-metallic building materials: Sand, gravel, crushed stone, asphalt, bitumen, cement, gypsum for use in construction, road construction, repair and covering work being jewelry casting; building materials as finished products made of concrete, gypsum, tiles of clay, potters' clay, natural or artificial stone, semi-worked wood, plastic composite blocks and synthetic flooring materials for building, construction, road construction purposes, non-metallic prefabricated buildings, non-metallic building materials, namely, partitions, non-metallic transportable buildings, poles, not of metal for power lines, barriers not of metal for parking areas, doors and window frames of wood and synthetic materials, namely, vinyl doors; traffic signs not of metal, non-luminous and non-mechanical, for roads; monuments and statuettes of stone, concrete and marble; natural and synthetic surface coatings in the form of road marking panels and sheets, being building materials; heat adhesive synthetic surface coating, being building materials in the nature of asphalt roof coating; bitumen cardboard coatings for roofing; bitumen coating for roofing; building glass; prefabricated swimming pools not of metal; aquarium sand

Owner

Board proceedings on this mark

Prosecution history

  • 12 Aug 2026 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
  • 09 Jul 2026 — NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
  • 22 Jun 2026 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 22 Jun 2026 — NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
  • 12 May 2026 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 12 May 2026 — REGISTERED-PRINCIPAL REGISTER
  • 19 Apr 2026 — EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED
  • 15 Dec 2025 — EXTENSION OF TIME TO OPPOSE RECEIVED
  • 11 Dec 2025 — NOTIFICATION PROCESSED BY IB
  • 09 Dec 2025 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 09 Dec 2025 — PUBLISHED FOR OPPOSITION
  • 03 Dec 2025 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 26 Nov 2025 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
  • 25 Nov 2025 — NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
  • 06 Nov 2025 — APPROVED FOR PUB - PRINCIPAL REGISTER

View this trademark record on Rightsy