SPERRE
Live / Registered — Registered — partial invalidation of extension of protection (as of 19 May 2026)
What this means for you
Registered since 30 Jul 2019. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 30 Jul 2029: the §71 ten-year affidavit of use).
Record
- Serial number
- 79240804
- Registration number
- 5815971
- Mark type
- Design + words
- Filed
- 22 May 2018
- Published for opposition
- 14 May 2019
- Registered
- 30 Jul 2019
- Next maintenance filing
- §71 ten-year affidavit of use, due by 30 Jul 2029 (grace period to 30 Jan 2030)
- Attorney of record
- Sheldon H. Klein
Goods and services
- Class 007 — Machines and machine tools: Machine tools, namely, computer numerical control (CNC) machines, machine centers, metal lathes, honing, grinding and polishing tools, assembly lines; motors and engines, except for land vehicles; machine coupling and transmission components, namely, flexible claw couplings and belt drives, except for land vehicles; compressors, namely, reciprocating compressors, rotary screw compressors, starting air compressors, working air compressors, instrument air compressors, air compressor systems, and nitrogen air compressor systems, air compressors
- Class 012 — Vehicles: [Apparatus for locomotion by land, air or water, namely, ships; diesel engines for land vehicles]
- Class 037 — Building construction and repair services: [Building construction;] repair and installation of machine tools, motors and engines (except for land vehicles), machine couplings and transmission components (except for land vehicles), compressors, vehicles, apparatus for locomotion by land, air, or water, propulsion machines for land vehicles
Owner
- SPERRE AIR POWER AS, Ellingsøy, NO
- Sperre Industri AS, NO
- Sperre Industri AS, NO
Prosecution history
- 19 May 2026 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
- 19 May 2026 — REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
- 18 May 2026 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 22 Jan 2026 — TEAS SECTION 71 & 15 RECEIVED
- 30 Jul 2024 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 22 Apr 2022 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 13 Dec 2019 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 23 Nov 2019 — FINAL DISPOSITION NOTICE SENT TO IB
- 23 Nov 2019 — FINAL DISPOSITION PROCESSED
- 30 Oct 2019 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 30 Jul 2019 — REGISTERED-PRINCIPAL REGISTER
- 18 May 2019 — NOTIFICATION PROCESSED BY IB
- 14 May 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 May 2019 — PUBLISHED FOR OPPOSITION
- 01 May 2019 — NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB