CERACHARGE
Live / Registered — Registered — Section 71 accepted (as of 16 Oct 2024)
What this means for you
Registered since 29 May 2018. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 29 May 2028: the §71 ten-year affidavit of use).
Record
- Serial number
- 79212576
- Registration number
- 5477790
- Mark type
- Word mark
- Filed
- 08 May 2017
- Published for opposition
- 13 Mar 2018
- Registered
- 29 May 2018
- Next maintenance filing
- §71 ten-year affidavit of use, due by 29 May 2028 (grace period to 29 Nov 2028)
- Attorney of record
- Todd A. Sullivan
Goods and services
- Class 009 — Scientific and electric apparatus: Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electricity conduits, electricity limiters; apparatus for recording, transmitting or reproduction of sound or images; data processing equipment and computers; energy simulators, namely, accumulators and batteries; batteries, rechargeable batteries; battery chargers, battery charge load indicator; battery charge measuring device; charging devices, namely, charging appliances for rechargeable equipment, wireless chargers, charging poles in the nature of charging stations for electric vehicles; electronic parts, namely, transformers, semiconductors, transistors; electronic components, namely, capacitors, integrated circuits, rectifiers; structural replacement parts for the aforementioned apparatus, devices and instruments
Owner
- TDK Electronics AG, München, DE
- EPCOS AG, DE
- EPCOS AG, DE
Prosecution history
- 18 Dec 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 16 Oct 2024 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 16 Oct 2024 — REGISTERED-SEC.71 ACCEPTED
- 07 Oct 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 06 Feb 2024 — TEAS SECTION 71 RECEIVED
- 29 May 2023 — COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
- 23 Nov 2018 — CHANGE OF NAME/ADDRESS REC'D FROM IB
- 29 Sept 2018 — FINAL DECISION TRANSACTION PROCESSED BY IB
- 11 Sept 2018 — FINAL DISPOSITION NOTICE SENT TO IB
- 11 Sept 2018 — FINAL DISPOSITION PROCESSED
- 29 Aug 2018 — FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
- 29 May 2018 — REGISTERED-PRINCIPAL REGISTER
- 13 Mar 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 13 Mar 2018 — PUBLISHED FOR OPPOSITION
- 09 Mar 2018 — NOTIFICATION PROCESSED BY IB