RED POINT
Live / Registered — Registered — Section 71 accepted (as of 15 Jan 2025)
What this means for you
Registered since 13 May 2014. The owner can stop confusingly similar uses in the classes it covers; it stays on the register as long as the owner keeps up the maintenance filings (next due by 13 May 2034: the §71 ten-year affidavit of use).
Record
- Serial number
- 79135243
- Registration number
- 4527588
- Mark type
- Word mark
- Filed
- 19 Jun 2013
- Published for opposition
- 25 Feb 2014
- Registered
- 13 May 2014
- Next maintenance filing
- §71 ten-year affidavit of use, due by 13 May 2034 (grace period to 13 Nov 2034)
- Attorney of record
- Jess M. Collen
Goods and services
- Class 006 — Metal goods: [Alloyed and unalloyed common metals; metal construction materials, namely, shores, braces; metal movable constructed components, namely, metal pipes and tubes, metal couplings and fittings for pipes; fittings for fluid and gas pipes, namely, couplings and flanges all of metal;] metal valves and fittings for fluid and gas pipes not being parts of machines; metal valves not being parts of machines
- Class 007 — Machines and machine tools: Valves and regulators for fluid and gas pipes, [filters and strainers for use in fluid and gas pipes, not included in other classes;] all of the aforementioned goods being parts of machines and engines
- Class 011 — Environmental control apparatus: Valves [and taps,] being part of chemical, petrochemical, pharmaceutical and other industrial process installations, as well as of installations for heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary
Owner
- Red Point Ventures B.V., Zoetermeer, NL
- Red Point Alloys B.V., Zoetermeer, NL
- Red Point Alloys B.V., Zoetermeer, NL
- Red Point Alloys B.V., Zoetermeer, NL
Prosecution history
- 02 Apr 2026 — PARTIAL INVALIDATION PROCESSED BY THE IB
- 02 Mar 2026 — PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
- 02 Mar 2026 — INVALIDATION PROCESSED
- 09 Dec 2025 — CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
- 22 Nov 2025 — CORRECTION TRANSACTION RECEIVED FROM IB
- 21 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 21 Nov 2025 — NEW REPRESENTATIVE AT IB RECEIVED
- 15 Sept 2025 — PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
- 15 Jan 2025 — NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
- 15 Jan 2025 — REGISTERED-SEC.71 ACCEPTED
- 16 Dec 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 13 May 2024 — TEAS SECTION 71 RECEIVED
- 13 May 2023 — COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
- 11 Jun 2020 — NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
- 11 Jun 2020 — REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.